Listeners:
Top listeners:
The Rock 106.7
K-Country 105.7
Q104.1 Central Kentucky's Hit Music
John Patrick “Johnie” Pierce
Pair Of Pulitzer Prize Recipients To Bookend 2026-27 Lindsey Wilson University Theatre Season
Taylor County Grand Jury Indictments: August 2026
Trooper Seth Stockton Joins KSP Post 15 After Academy Graduation
Lindsey Wilson University Counseling Professor Honored For Work With Journal
SOMERSET, Ky. (Oct. 15, 2025) – The Kentucky Transportation Cabinet (KYTC) is seeking public comments during the preliminary engineering and design phase for proposed improvements along East KY 70 in Casey County, from mile point 16.8 (Moccasin Creek) to mile point 19.0 (Singleton Drive). The project, funded through the 2024–2030 State Highway Plan, aims to enhance safety and mobility along this section of roadway.
Two realignment alternatives have been selected for final consideration. KYTC District 8 invites the public to review project information and share feedback on the proposed improvements and the selected alternatives.
To see the realignment alternates and project details, visit the project webpage at https://transportation.ky.gov/DistrictEight/Pages/Casey-County-KY-70-Realignment.aspx.
Comments will be accepted through November 7, 2025. For additional project information or special assistance, please contact the KYTC Project Manager, Joe Gossage at 502-764-0339.
To learn more about the state’s highway program, visit the 2024–2030 Enacted Highway Plan.

(Amber Hale – Kentucky Transportation Cabinet District 8)
Written by: Faith Speaks
HERE IT GOES YOUR COPYRIGHT TEXT. CAN ALSO CONTAIN LINKS LIKE THIS